Dispersed sites, massive volumes, one reconciled number
Canals, dams and lift-irrigation stretch across dozens of kilometres and remote reaches, on huge earthwork and lining volumes. InCore captures the field offline and rolls every reach up to one BOQ-based progress and cost picture.
What makes irrigation & water hard to run
These are the places money and time leak on projects like yours today — and exactly where the BOQ spine changes the game.
Work spreads across long canal reaches and remote headworks where signal is unreliable — but the DPR still has to be captured daily.
Excavation, embankment and CC lining move enormous quantities that must reconcile to the Measurement Book by chainage.
Fleets of excavators, dozers and tippers dominate cost — fuel and utilization need to land on the right BOQ item.
Cement, steel and lining materials issued across many reaches are hard to reconcile against the BOQ without a live stock ledger.
The pillars that matter most for you
The same platform, focused on the modules that move the needle for your sector. Each connects through the shared BOQ item.
Offline-first mobile capture of earthwork and lining quantities by reach, syncing on reconnect and posting to the BOQ line.
- Rolling look-ahead planning → promote planned tasks to live work items
- Work allocation with quantity capture posted straight to the BOQ line
- Coded delays & weather logging — extension-of-time (EOT) claim ready
- Material at site → real Stores issue / receipt, tagged to the BOQ item
- Auto-consolidated Digital DPR & Weekly Progress Report with S-curve delta
Operator logbook, HSD issue and ₹/hr costing so the plant fleet — the dominant cost — ties back to the BOQ and cost code.
- Deployment, site transfer and operator assignment
- Operator logbook — SMR in/out, working / idle / breakdown hours
- Fuel management — HSD issue, ₹/hr and L/hr
- Hired-equipment log sheets and hire bills
- Equipment costing — own vs hire
Chainage-wise Measurement Book, escalation, retention and cumulative RA bills across long linear works.
- Contract register — retention, defect-liability, price escalation
- BOQ builder with CPWD / SOR import; DSR rate analysis build-ups
- Schedule of Values for milestone (lump-sum / EPC) billing
- Statutory Measurement Book — chainage, nos × L × B × D, deviation
- Certification chain: Engineer → QS → PM → client sign-off
Stores, GRN, stock ledger and consumption-vs-BOQ reconciliation across dispersed site stores.
- Indents from the BOQ line or site-store reorder
- RFQ, quotation capture and comparative statement
- Purchase, service & rate-contract orders; service entry sheets
- Three-way match (PO ↔ GRN ↔ invoice) → hands off to AP
- Committed-vs-budget (CBS) checks with over-budget flags
What changes for irrigation & water on InCore
One BOQ spine, from the field to the boardroom — so the numbers reconcile and the leakage stops.
- Capture the DPR at remote reaches — offline — and never lose a day's work
- Reconcile earthwork and lining volumes to the MB by chainage, automatically
- Cost the plant fleet to the BOQ — the difference between profit and loss
- Roll dozens of reaches up to one progress and cost number