Many trades, many subcontractors, one BOQ spine
High-rises, campuses and urban works run on dozens of finishing trades and subcontractors. InCore keeps every subcontract back-to-back with the client BOQ — so what you certify to the client and what you pay the subcontractor always reconcile.
What makes buildings & urban infra hard to run
These are the places money and time leak on projects like yours today — and exactly where the BOQ spine changes the game.
Blockwork, plaster, flooring, façade, MEP — each a separate subcontract that must reconcile back-to-back with the client BOQ.
Fit-out and finishes generate a long tail of measurement and certification that's painful to run manually.
Materials issued floor-by-floor need consumption-vs-BOQ control and gate-pass discipline (RGP/NRGP).
Large on-site labour forces mean CLRA/BOCW registers and safety records that have to be audit-ready.
The pillars that matter most for you
The same platform, focused on the modules that move the needle for your sector. Each connects through the shared BOQ item.
Client BOQ, Measurement Book and RA bills with subcontract back-to-back reconciliation, variations and retention — certify and pay in sync.
- Contract register — retention, defect-liability, price escalation
- BOQ builder with CPWD / SOR import; DSR rate analysis build-ups
- Schedule of Values for milestone (lump-sum / EPC) billing
- Statutory Measurement Book — chainage, nos × L × B × D, deviation
- Certification chain: Engineer → QS → PM → client sign-off
Indent → PO → GRN, three-way match, stock ledger and gate pass (RGP/NRGP) to control materials across floors and trades.
- Indents from the BOQ line or site-store reorder
- RFQ, quotation capture and comparative statement
- Purchase, service & rate-contract orders; service entry sheets
- Three-way match (PO ↔ GRN ↔ invoice) → hands off to AP
- Committed-vs-budget (CBS) checks with over-budget flags
Muster attendance, piece-rate wages and CLRA/BOCW registers for large on-site labour forces — plus full HRMS and payroll.
- Labour master, gangs / crews and dispatch
- Muster attendance — photo / GPS selfie / face / kiosk
- Productivity — units-per-hour vs budget, time to cost-code
- Piece-rate wages with CLRA / BOCW registers
- HRMS: employee lifecycle, shifts, attendance & leave
Inspection checklists, NCRs and safety observations across many trades working in parallel.
- Inspection & pour-card checklists
- Non-conformance reports (NCR) with closure tracking
- Material & lab test records
- Incident and near-miss reporting
- Safety observations and corrective actions
What changes for buildings & urban infra on InCore
One BOQ spine, from the field to the boardroom — so the numbers reconcile and the leakage stops.
- Keep every subcontract back-to-back with the client BOQ, automatically
- Run the long finishes-billing tail without spreadsheets
- Control material issue and consumption floor-by-floor, trade-by-trade
- Keep CLRA/BOCW and safety registers audit-ready at all times